Prototype Fast Breeder Reactor at Kalpakkam reaches criticality

· Kalpakkam

India's 500 MWe Prototype Fast Breeder Reactor at Kalpakkam achieved first criticality on 6 April 2026.

The sodium-cooled Prototype Fast Breeder Reactor was built at Kalpakkam as the start of the second stage of India's three-stage nuclear power programme. Construction began in 2004 but faced long delays; core loading began on 4 March 2024 in the presence of Prime Minister Narendra Modi. After further technical issues were resolved, the reactor achieved first criticality on 6 April 2026. Kalpakkam already housed the Madras Atomic Power Station and the Fast Breeder Test Reactor.

Related events

  1. 1970

    1. 1970KalpakkamScience Technology

      Construction of Madras Atomic Power Station begins at Kalpakkam

      Work began on the Madras Atomic Power Station at Kalpakkam, India's first indigenously built nuclear power station.

  2. 1971

    1. 30 Apr 1971KalpakkamScience Technology

      Reactor Research Centre set up at Kalpakkam

      An order by Vikram Sarabhai set up the Reactor Research Centre at Kalpakkam, which later became the Indira Gandhi Centre for Atomic Research.

  3. 1984

    1. 27 Jan 1984KalpakkamScience Technology

      First unit of Madras Atomic Power Station reaches full power

      At Kalpakkam, MAPS-1, the first nuclear power reactor India built largely on its own, reached full-power operation.

  4. 1985

    1. Oct 1985KalpakkamScience Technology

      Fast Breeder Test Reactor at Kalpakkam reaches criticality

      India's Fast Breeder Test Reactor at Kalpakkam reached first criticality, making India the seventh nation able to build and run a breeder reactor.

  5. 1986

    1. 21 Mar 1986KalpakkamScience Technology

      Second unit of Madras Atomic Power Station commissioned

      The second 220 MW unit of the Madras Atomic Power Station at Kalpakkam was commissioned, completing the two-unit station.

  6. 2013

    1. 22 Oct 2013KudankulamInfrastructure

      Kudankulam reactor 1 connected to the grid

      Following years of delay and protest, the first VVER-1000 reactor at Kudankulam was synchronised with the power grid.